Untitled Page
 |

Hefner Electric is contracted by other System
Integration firms for the more difficult field
installations.
This installation required the installation of four
(4)
Clarity Bobcat ceiling mounted LCD displays overhead
the IT department main control consoles.
The room was manned by four (4) engineers, while the
installation took place.
Hefner Electric owns and maintains several styles of
scaffolding, scissor lifts, and material lifts to
aid in these types of installations. |
|

Hefner Electric’s Senior Technician installing a
Da-lite recessed screen utilizing our Genie Lift.
This proven method affords us to install the screen
properly and with the upmost care of the display
equipment. |
|

Wall mounted SP Controls wall box installation.
Hefner Electric has been installing and servicing SP
Controls products for 7 years.
A typical classroom installation with wall box, SP
controller, and tilt down VCR/DVD laptop table. |
|
|
|
|
|